Planning with confidence
Before you sign: how to compare kitchen cabinetry proposals
Compare cabinetry proposals by drawings, materials, responsibilities and unresolved decisions—not the total alone.
FEHRCO JOURNAL · 3 MIN READ

Two cabinetry proposals can have similar totals and describe very different work. They can also have different totals because one includes decisions or responsibilities that the other leaves open.
Before comparing the price, compare the scope. Put the drawings, materials, hardware, installation responsibilities and outstanding selections side by side. The aim is to understand what each proposal actually commits to.
Match the drawings first
Check that each proposal refers to the same room arrangement and the same version of the plans. Count the cabinet runs, tall storage, island elements and any other rooms included.
Ask whether decorative panels, fillers, trim and exposed ends are identified. Those details may look incidental in a rendering but still need to be designed, supplied and installed.
Compare the specification in plain language
Record the proposed cabinet construction, door and drawer-front materials, finish and hardware. Avoid assuming that broad descriptions such as custom or solid wood answer every question.
If you do not understand a term, ask what it applies to. A door material does not necessarily describe the cabinet interior. A hardware brand alone may not identify the particular fitting or its intended use.

Put storage accessories on the list
Confirm the organizers and pull-outs that are included, and where they appear on the drawing. A visual example shown during a meeting may not be part of the final scope.
Kent Line includes several planned storage features within its cabinetry. Use project examples to identify what you would like to discuss, then confirm the selections in your own proposal. Do not assume a feature transfers from one project to another automatically.
Draw a boundary around the work
Ask who handles removal, disposal, site preparation, countertop coordination and any plumbing, electrical or ventilation work. Establish which responsibilities belong to the cabinetmaker, other trades or the homeowner.
Clarify installation conditions and access as well. If the room is not ready on the expected date, ask how that will be handled. A cabinetry proposal should not be read as a whole-renovation agreement unless it explicitly describes that scope.
Identify decisions that can change the total
List allowances, optional items and selections that are not final. Ask how changes are priced and documented, when approvals are needed and what a revised choice could affect.
Discuss timing, payment milestones and the applicable warranty in the actual written proposal. Do not rely on a general website statement to settle the terms of your specific agreement.
Leave the meeting with fewer assumptions
Make a comparison sheet with four columns: item, proposal A, proposal B and clarification needed. Put “not stated” where information is missing. Do not fill a gap with the more favourable interpretation.
Start with the differences that matter to your daily use and expectations. If one proposal excludes an important element, ask for clarification before treating its lower total as a saving.
The most useful proposal is one you can explain: what will be made, what it will include, how it relates to the drawings and what still needs to be decided. That understanding gives you a stronger basis for the next conversation.
SEE THE REAL WORK
Project references describe the featured work. Your own layout, selections and scope need individual review.
FROM IDEAS TO YOUR ROOM